Alder Coppice
Alder Coppice Primary School, Dudley
The Challenge
Alder Coppice Primary School was operating with an outdated kitchen extraction and ventilation system that was no longer fit for purpose. The existing setup was inefficient, ageing, and unable to support the school’s evolving catering requirements effectively.
In addition, the school wanted to modernise its kitchen by moving away from gas appliances and transitioning to a safer, more energy-efficient all-electric catering environment.
The Solution
Abraxas designed, supplied, and installed a complete new kitchen ventilation system fully compliant with DW/172 standards, ensuring improved performance, efficiency, and regulatory compliance.
As part of the kitchen upgrade, Abraxas also supplied and installed a range of modern, energy-efficient electric catering equipment, including:
Induction range
Electric fryer
10-grid Rational combi oven
The Outcome
The completed project delivered a modern, compliant, and energy-efficient kitchen environment tailored to the school’s operational needs.
Key benefits included:
Improved kitchen ventilation and extraction performance
Compliance with current DW/172 standards
Reduced reliance on gas appliances
Increased energy efficiency
Modernised catering facilities
Enhanced working environment for kitchen staff
The result was a future-ready catering kitchen designed to support the school’s long-term operational and sustainability goals.








